Five wind farms being built at full speed
21.6.2010
The Energiewerkstatt Consulting GmbH team is busy with the supervision of the construction work at three wind farms in Lower Austria, one in Bulgaria and one in Romania. Manfred Feichtenschlager is responsible for the projects in Lower Austria. Thomas Sutter overlooks the work in Bulgaria and Romania. All except one of the future wind farm operators are Austrian companies. 13 wind turbines with a total installed capacity of 28 MW are being installed.

