Skip navigation
  • Home
  • Company
    • Who we are
    • Know-how
    • Accredited Testing Center
    • Research and development
      • Research project „Wind Turbine Performance Testing”, Upper Austria (2016)
      • Project: "ProTRANS - 4.0"
    • Team
      • Getting to know our team
    • Jobs
  • Contact
    • Contact - our employees
    • Getting to know our team
    • Directions
      • Office Munderfing
      • Office Bruck/Leitha
  • News/Events
    • News
    • Events
  • Newsletter
 
Skip navigation
  • Wind energy
    • Services Overview
    • Measurement and Evaluation
    • Planning
    • Electrical and Power Systems Engineering
    • Implementation
    • Technical Operation Management
    • Repowering
    • Biology / Ecology
  • Photovoltaics
  • E-Mobility
  • References
    • Wind Energy Projects
    • Reference List
 
Skip navigation
  • Home
  • Company
  • The press
  • Contact
  • Newsletter
  • Login
 
EWS Consulting
EWS
  • EN
    • EN
    • DE
Skip navigation
  • Wind energy
    • Services Overview
    • Measurement and Evaluation
    • Planning
    • Electrical and Power Systems Engineering
    • Implementation
    • Technical Operation Management
    • Repowering
    • Biology / Ecology
  • Photovoltaics
    • solar-power-analysis
    • EWS Sonnenfeld® (Agrivoltaics)
    • Energy from wind & sun
  • E-Mobility
    • EWS Power Charging
  • References
    • Wind Energy Projects
    • Reference List
 

# We think in generations.

Austria news archiv

hlo 009 wea03.JPG
hlo 003 wea01.JPG
haf 007 wea01.JPG
haf 007 wea02.JPG

Windpark Haadfeld and Höflein Ost – last rotor blade installed

12.10.2015

Robert Gramlinger : Energiewerkstatt Consulting GmbH

EWS Emergency plan

1.9.2015

DSCN2692.JPG
DSCN2849.JPG
DSCN2899.JPG
DSCN2924.JPG
DSCN2947.JPG

EWS short report – construction progress in Windpark Ladendorf

21.7.2015

dpb sutter-joham.JPG
hr-II kabelbau 1.JPG
hr-II kabelbau 2.JPG
vermessung-herr-chwatal erste absteckung

Austrian premiere for Vestas V126 in Windpark Hohenruppersdorf II

14.7.2015

sf II kabelbau wea1 nach 2 (4).JPG
sf II wea sf04 3.JPG
sf II wea sf02 12.JPG
sf II wea02 begehung hinteregger senvion 1.JPG
sf II weg W01  01.JPG

Windpark Simonsfeld II – Right next door to the WKS management

25.6.2015

mm usb01
DSCN1050

Windpark Marchfeld Mitte – EWS completes construction word – wind turbines begin normal operation

11.6.2015

LiDAR based wind measurement and Owners Engineering Services for the turkish market

Workshop: LiDAR wind measurements and Owners Engineering Services

26.5.2015

EWS Workshop for Wind Energy Projects

EWS Workshop for Wind Energy Projects in Turkey

8.5.2015

workshop windenergie ews 01
workshop windenergie ews 02
workshop windenergie ews 03

EWS makes wind energy attractive for Turkish students

7.5.2015

verkabelung ews.JPG
wegebau ews.JPG
kranstellflaeche ews.JPG

Wind farm Großkrut Hauskirchen Wilfersdorf – EWS Construction Management in full swing

5.5.2015

Page 4 of 14

  • « First
  • Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • Next
  • Last »
Nach oben
  • EWS Consulting References
  • Our Know-how
  • Responsibility CSR
  • Cooperation
  • Research & Development
  • Accredited Services
  • Turnkey Mast/LiDAR Measurements
  • Owner’s & Lender’s Engineering Services
  • EWS Construction Monitoring
  • Community-owned Wind Farm
  • Biology / Ecology
  • Wind Energy Projects Austria
  • Wind Energy Projects International
  • Photovoltaics
Copyright 2021
EWS Consulting GmbH
Imprint/AGB - Legal Indications
+43 7744 20141-0
office@ews-consulting.at