Skip navigation
  • Home
  • Company
    • Who we are
    • Know-how
    • Accredited Testing Center
    • Research and development
      • Research project „Wind Turbine Performance Testing”, Upper Austria (2016)
      • Project: "ProTRANS - 4.0"
    • Team
      • Getting to know our team
    • Jobs
  • Contact
    • Contact - our employees
    • Getting to know our team
    • Directions
      • Office Munderfing
      • Office Bruck/Leitha
  • News/Events
    • News
    • Events
  • Newsletter
 
Skip navigation
  • Wind energy
    • Services Overview
    • Measurement and Evaluation
    • Planning
    • Electrical and Power Systems Engineering
    • Implementation
    • Technical Operation Management
    • Repowering
    • Biology / Ecology
  • Photovoltaics
  • E-Mobility
  • References
    • Wind Energy Projects
    • Reference List
 
Skip navigation
  • Home
  • Company
  • The press
  • Contact
  • Newsletter
  • Login
 
EWS Consulting
EWS
  • EN
    • EN
    • DE
Skip navigation
  • Wind energy
    • Services Overview
    • Measurement and Evaluation
    • Planning
    • Electrical and Power Systems Engineering
    • Implementation
    • Technical Operation Management
    • Repowering
    • Biology / Ecology
  • Photovoltaics
    • solar-power-analysis
  • E-Mobility
    • EWS Power Charging
  • DeCarb
    • DeCarb
    • Corporate Carbon Footprint (CCF)
    • Climate report of the EWS group 2017
  • References
    • Wind Energy Projects
    • Reference List
 

# We think in generations.

Austria news archiv

Owner’s Engineering in Turkey

7.5.2014

AFDB Delegation 30.3.2014.JPG
AFDB Delegation Sitzung 30.3.2014.JPG

14 companies used the „ proximity“ of the African Development Bank in Tunis

3.4.2014

FeaS1.JPG
FeaS2.JPG

Feasibility study for industrial company in Romania

24.3.2014

News

With a lot of momentum in year 2014!

13.1.2014

Upper Bavaria´s largest community-owned wind farm is taking shape

12.12.2013

from left to right: Matthias Neubauer (EWS), Gerhard Steindl (EWS), Armin Geyer (neoVIS), Stephan Schinko (neoVIS),  Markus Oßner (neoVIS) and Joachim Payr (EWS)

First EWS wind farm project in Bavaria in implementation phase

19.11.2013

News
Halbturn Süd WEA 29

Building progress Windpark Halbturn Süd – last rotor blade installed on 15 October 2013

28.10.2013

News

Technical assistance for WBIF

8.10.2013

News

EWS congratulates the province of Burgenland on the day of “Energiewende”

17.9.2013

<p>The Energiewerkstatt Consulting expands its fleet of LIDAR equipment. A second unit with fuel cells goes into operation.</p>

The Energiewerkstatt Consulting expands its fleet of LiDAR equipment: a second unit with fuel cells goes into operation

3.9.2013

Page 7 of 14

  • « First
  • Previous
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Next
  • Last »
Nach oben
  • EWS Consulting References
  • Our Know-how
  • Responsibility CSR
  • Cooperation
  • Research & Development
  • Accredited Services
  • Turnkey Mast/LiDAR Measurements
  • Owner’s & Lender’s Engineering Services
  • EWS Construction Monitoring
  • Community-owned Wind Farm
  • Biology / Ecology
  • Wind Energy Projects Austria
  • Wind Energy Projects International
  • Photovoltaics
Copyright 2021
EWS Consulting GmbH
Imprint/AGB - Legal Indications
+43 7744 20141-0
office@ews-consulting.at